Jump to content

koko

San Andreas Housing Agency
  • Posts

    813
  • Joined

  • Last visited

Everything posted by koko

  1. SAFD CONVOY Participants: Screenshots: https://imgur.com/a/BT1iCFp
  2. Roleplay Type: Building Fire Description of roleplay: It was a normal day at the firehouse. Then we got a call for 904B in LS. There was a big fire on 2 floors so we had to split into 2 teams. Once we arrived, we cleared the perimeter and began putting out the fire. Location: LS Participants: Screenshots: https://imgur.com/a/BNvA2gX
  3. Participants: Me District: All Shift period: 20 mins Number of Cars Extinguished: 6 Screenshots: https://imgur.com/a/s535kST
  4. Roleplay Type: Building Fire Description of roleplay: There was a report of a 904B in LV. Our crew responded and arrived at the location. Firstly, we checked for any victims or checked the area for any signs for a fire. There weren't any leaks or fires of closer cars . I grabbed a water plug from the Fire Engine and went to stop fire. Location: LV Participants: @koko , @Rieeria @Glayd @jonas13362, @Aoxy, @RAMPAGE Screenshots: https://imgur.com/a/6IAvzSU
  5. Participants: Me, @Rieeria , @jonas13362 District: All Shift period: 32 mins Number of Victims healed: 9 Screenshots: https://imgur.com/a/56nGD4S
  6. Participants: Me District: All Shift period: 40 mins Number of Victims healed: 9 Screenshots: https://imgur.com/a/0Dxehem
  7. Participants: Me District: All Shift period: 32 mins Number of Victims healed: 8 Screenshots: https://imgur.com/a/UB13QrH
  8. Participants: Me District: All Shift period: 30 mins Number of Victims healed: 4 Screenshots: https://imgur.com/a/oUoVU0Z
  9. Participants: Me District: All Shift period: 42 mins Number of Victims healed: 13 Screenshots: https://imgur.com/a/uhLinbL
  10. Event type: UZI LMS Prize: 1.000.000$ LWS Helper(s):Me Winner(s): @Rio Screenshot(s):https://imgur.com/a/eFgYwlk
  11. Event type: Maze Prize: 1.000.000$ LWS Helper(s):Me Winner(s): @Enez Screenshot(s):https://imgur.com/a/ejG4PBv
  12. Participants: Me District: All Shift period: 23 mins Number of Victims healed: 9 Screenshots: https://imgur.com/a/RaxJE5T
  13. Participants: Me District: All Shift period: 21 mins Number of Victims healed: 9 Screenshots: https://imgur.com/a/i2ru8jw
  14. Participants: Me District: All Shift period: 23 mins Number of Victims healed: 7 Screenshots: https://imgur.com/a/nmzdGJq
  15. Participants: Me District: All Shift period: 20 mins Number of Cars Extinguished: 10 Screenshots: https://imgur.com/a/ZaCZPcG
  16. Date: 26/03/2023 Participants: @Mistigun Story: Today i came early to the garage to clean some mess up in the garage, but it didnt took even 10 minutes or i already heard a horn out of the garage, it was my first costumer of today, which was very relaxed, even tho his engine was making a weird sound, at first i didnt heard anything, but then he started up his engine, and it already gave me headaches. so i decided to take a look into it, and it was pretty mess, so i replaced it with another engine which was like the same color of his car SS: https://imgur.com/a/wXNwcYc
  17. Participants: Me District: All Shift period: 51 mins Number of Cars Extinguished: 1 Screenshots: https://imgur.com/a/RYTqdDz
  18. Participants: Me District: All Shift period: 20 mins Number of Cars Extinguished: 6 Screenshots: https://imgur.com/a/C0yiUji
  19. Participants: Me District: All Shift period: 27 mins Number of Cars Extinguished: 6 Screenshots: https://imgur.com/a/KU2MsIw
  20. Participants: Me District: All Shift period: 40 mins Number of Cars Extinguished: 6 Screenshots: https://imgur.com/a/si2W9Du
  21. Participants: Me District: All Shift period: 30 mins Number of Cars Extinguished: 9 Screenshots: https://imgur.com/a/XjjzcOx
  22. Date: 20/03/2023 Participants: @LightSide Story: Got a call from LightSide saying that his Bike needs a Tire replacement. I was surprised because I did not expect someone to come in with a bike. I told him to come to my garage so I can replace it. Once he came, I removed the old tires and replaced it with the new ones. This took me about 20 minutes. I was then done and the cost was 100 dollars. SS: https://imgur.com/a/YrcQNjT
  23. Date: 20/03/2023 Participants: @alone Story: Here I am waiting at my garage. I then got a call from a guy saying that his doors, trunk, and hood is broken and gotta be replaced. I told him to come to my garage so I can fix it. The customer came in 20 minutes. I started with his doors first and replaced it. I then replaced his trunk and his hood. After I was done, the customer was satisfied and payed me 3,000 dollars for everything. SS: https://imgur.com/a/z5eMhAW
  24. Participants: Me District: All Shift period: 40 mins Number of Cars Extinguished: 11 Screenshots: https://imgur.com/a/Jn73AYp
  25. Participants: Me District: All Shift period: 39 mins Number of Cars Extinguished: 6 Screenshots: https://imgur.com/a/Yxwz0IA
×
×
  • Create New...