Jump to content

ZIP - DALIO's Portfolio


DALIO

Recommended Posts

  • 6 months later...

alt text


#1




  • The City of San Andreas Present :woman_construction_worker_medium-light_skin_tone:
    :building_construction:
    ZIP Planning And Construction Project




  • Project: Building a bridge from Hunter Quarry to Red County




  • Works: Reducing traffic at the level of the two bridges were 's Fallow Bridge and Martin Bridge




  • Monitoring office: IOSST Company




  • Cost of the project: $3.705.642.055




  • Company: ZIP Construction




  • Date of commencement of works: 01/04/2021
    alt text
    Rest of the SS




Link to comment
Share on other sites

  • 3 months later...

alt text
alt text


DALIO's BRIDGE


Construction_number:#1
Number of objects: 466



  • Our bridge is fully completed and ready to start accepting people and cars who always look for a fast pass without traffic problems, our bridge is the solution wich contain four sides to make your way safe and fast.

  • The bridge is set to a maximum load of 290 pounds per track that passes. This means that those trucks that have exceeded this load cannot pass through it.

  • Today is day one and opening day so we welcome everyone to experience a beautiful ride on our bridge.
    welcome everybody.


:::


Spoiler Text
alt text
alt text
alt text
alt text
alt text
alt text
alt text


:::


Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...